Estimator: Carl Cole
Customer: UAW Local 434
Scope: Pressure wash all masonry, grind and repoint, remove and replace smalled or cracked clay tile, cut out and re seal vertical expansion joint, remove and replace outer-wythe door lintel, apply saturation coat of water repellent